HYDROFORMING

|


« back to Projects page |
General Project Requirements
- cool hydraulic oil heat exchangers
- cool hi-tech laser spot welders
- provide 500 tons of chilling capacity
- provide 1,500 tons of cooling tower capacity
CIMCO Solution
- Central PLC control
- User-friendly remote monitoring from any PC station in the facility
- Heat exchangers separate tower water from process water
- Multi-stage water filter system cleans and reclaims all circuit water
- Closed and pressurized chilled water system to reduce corrosion
- Central PLC controls pump, chiller and tower operations
- Low kilowatt per ton chillers
- VFD (variable speed) chilled water pumps
- Automatic water control valves at processes to limit water flow and pump demand
- 250 ton R-134A screw compressor chillers with minimum moving parts
- Large water storage to minimize on/off cycling of components
- Standby pumps, chillers and towers
- PLC rotates lead/lag pumps, chillers and towers for even wear and usage
|
|
 |