Skip to main content

 

Biopharmaceutical company chooses CO2 system for first Canadian manufacturing plant

 

Marking a new chapter in Canada’s biopharmaceutical industry, Green Cross Biotherapeutics Inc. (GCBT) has opened the first and only intravenous immunoglobulin (IVIG) and albumin manufacturing plant in Quebec, Canada. Made possible by a joint investment by the Government of Quebec, the $400 million state-of-the-art facility in Technoparc, Montreal was inaugurated on Oct 30, 2017.

"We are thankful to the Government of Quebec, whose contribution is supporting this important investment. Through its funding, the government acknowledges the economic value and health benefits that our project is bringing," said CEO of GCBR, Young-Ho Kim. 

These benefits are certainly unique. The facility will manufacture products including intravenous immunoglobulin, a vital therapeutic solution for treating patients with infectious and immune diseases, and albumin, which is used as a blood-volumizing agent and in the treatment of burns. The plant also provides plasma fractionation and boosts Canadian healthcare security by improving the self-sufficiency of its plasma protein product supply.

Challenges and Needs

Montreal is the ideal location for this manufacturing plant – beyond its innovative drive and skilled workforce, it is strategically advantageous for GCBT to manufacture IVIG and albumin in Quebec. However, this facility posed two unique challenges in terms of design. 

First, to ensure that production would not slow down or lag in the future, everything needed to be designed with extra capacity and back up support. The second challenge was the mechanical room; located on the fifth floor, it did not meet B52 requirements. This meant an ammonia-based system was not an option for the plant.

The facility required two freezers to store and maintain its product at all times. It needed multiple process double-jacketed tanks cooled with propylene glycol. Green Cross already had Freon-based systems running in plants in Korea, so an alternative refrigerant would have to prove stronger in various respects. 

Taking these challenges and needs into account, CIMCO Refrigeration presented the advantages of its CO2 package for low-temperature application. 

The Solution

cimco-pack-co2

Crucial considerations for the system included safety and risk management, energy savings, environmental impact, and reliability. CO2 was the superior refrigerant in all of these aspects. It was as safe as other refrigerants, far more eco-friendly, provided higher energy savings, and it was economically feasible. The CIMCO CO2 industrial packaged system also proved a better solution than CO2 transcritical commercial systems proposed by competitors. 

Based on the desired objectives, CIMCO installed a subcritical CO2 low-temperature package. This included Mycom compressors with a capacity of 75TR, a glycol pumping station package, and 450TR York Process Chiller to cool the P.G. 25% at -1°C. The glycol -1°C is used to condense the CO2, for miscellaneous HVAC cooling, and to purify the water system for pharmaceutical use.

 

Overall Results

The completion of this unique facility marks a major advancement for the Canadian health market.

"For Canadian patients and their healthcare providers, this means securing access to a local and stable source of therapeutic plasma-derived products," said Chairman of the GCBT, Il-Sup Huh.

By installing a CO2 system, GCBT has demonstrated its commitment to not only the Canadian public but the environment too.

 

 


 

 

To know more about this project, send an email to cimcocommunications@aim.toromont.com 

 

Download case study

 

 

 

 

Related Posts

 

CIMCO Delivers Sustainable CO₂ Cooling for Sobeys' Automated Facility

When Sobeys set out to build a state-of-the-art Customer Fulfillment Centre (CFC) in Rocky View, Alberta, to support its growing Voilà online grocery delivery service, it turned to CIMCO to help bring its long-term sustainability goals to life.
Read more

Decarbonization Trends Shaping Industries

As businesses navigate this complex landscape, understanding key trends and practical approaches becomes essential for making sustainable decisions that contribute to significant carbon footprint reduction
Read more

CIMCO Achieves Landmark Project Success at Maple Leaf Foods Poultry Processing Facility in London, ON

CIMCO’s engineering department showcased its world-class capabilities by completing its largest-ever project, the 660,000 ft2 Maple Leaf Foods' poultry processing facility in London (Ontario), on time and on budget.
Read more

Have Questions? Speak with the experts.

Connect with CIMCO today to learn more.

Contact us